Warehouse Space Calculator
Estimate dock space, pallet storage capacity, and overall warehouse area requirements based on your throughput, pallet dimensions, and racking configuration.
1. Dock & Staging Space
Throughput
Pallet footprint (dock calc)
2. Pallet Storage Location
Pallet & clearance dimensions (mm)
Storage area in warehouse (m)
3. Warehouse Area Allocation
| Area | m² | % of total | Typical range |
|---|---|---|---|
| Dock & staging activities | – | – | 10% – 15% |
| Storage & handling activities | – | – | 70% – 80% |
| Non-activity area (e.g. office) | – | – | 3% – 5% |
| Total warehouse area | – | 100% | – |
4. Racking Capacity Comparison Quick Check
| Storage medium | Rate (pallets/level/m²) | # pallets per level | Total pallet locations (est.) |
|---|
3PL Warehousing Cost Calculator
Estimate the annual operating cost of a 3PL warehousing arrangement across storage, inbound/outbound pallet handling, and container loading/unloading — in your base currency and a second reporting currency.
Currency & Assumptions
Storage Cost
Inputs
Inbound Pallet Movement
Inputs
Outbound Pallet Movement
Inputs
Container Loading
Inputs
Container Unloading
Inputs
Total Annual Operating Cost Summary
| Category | SGD / yr | EUR / yr | % of total |
|---|---|---|---|
| Total annual operating cost | – | – | 100% |
Weighted Factor Matrix Calculator
Score and rank competing options (sites, vendors, DC locations, etc.) against custom weighted factors — weightings, scoring bands, and per-option scores feed a single weighted total.
1. Factors & Weightings
2. Scoring Bands
| Points | Lower-is-better factor(s)value ≤ threshold scores these points | Higher-is-better factor(s)value ≥ threshold scores these points |
|---|
3. Options
4. Weighted Scores
Volume Availability Calculator
Model how a staff crew's processing capacity catches up with arriving volume through a shift — ramp-up, breaks, and idle time included — and see the completion time before the day starts.
1. Volume Arrivals
| Time | Volume |
|---|
Staff Productivity — Phase 1 (before break)
Staff Productivity — Phase 2 (after break)
Break
Other
2. Results
Gantt Chart
Plan and visualise task timelines across a year. Enter a task, its start date and duration — the end date and the timeline bar are calculated automatically.
Timeline Settings
Tasks
| Task | Start date | No. of days | End date |
|---|
Gantt Chart 2017
Warehouse Costing
Your live project cost estimator, embedded from croweservices.com.au/costing/.
Warehouse Design — DXF Generator
Generates the 2D layout DXF entirely in your browser — no server, no upload. Output is byte-for-byte identical to the original Python generator.